Honda Accord: Engine Assembly

Cylinder Head
...
See also:
Fuel Pressure Regulator Replacement
1. Remove the fuel tank unit (see page 11-320).
2. Remove the reservoir (A).
3. Remove the bracket (B).
4. Remove the fuel pressure regulator (C).
5. Install the parts in the reverse order ...
PCV Valve Inspection
1. Check the PCV valve (A), hoses (B), and connections
for leaks or restrictions.
1.PCV valve when the hose between the PCV valve and
intake manifold is lightly pinched (A) with your fingers
or ...
Secondary Shaft 2nd Gear Axial
Clearance Inspection
1. Install the thrust needle bearing (A), the needle
bearing (B), 2nd gear (C), the thrust needle bearing
(D), the 37 x 58 mm thrust washer (E), and the 2nd
clutch (F) on the secondary shaft (G), t ...
